Newsletter: Repaving begins for Bethany Drive
Published on September 24, 2026
Crews are repaving Bethany Drive following the replacement of 120 feet of old water main pipeline.
The road repavement follows emergency repairs made in August after a water main break. The water main has been replaced with a larger pipe. The District conducted a geotechnical study in collaboration with the City of Scotts Valley to ensure the quality of the road repair.
More:
Spotlight Items
District News
