Existing Customers | Maintenance
The Customer shall begin a preventive maintenance program that will ensure that the recycled water system always remains in compliance. A preventive maintenance program should include but not be limited to the following:
- Regular inspections shall be conducted by the Customer of the entire recycled water system including sprinkler heads, drip irrigation system emitters, spray patterns, takes, piping and valves, pumps, storage facilities, controllers etc. Immediately correct any leaks, breaks, or discrepancies in permit requirements.
- All warning signs, tags, stickers, and above grade pipe markings shall be checked for their proper placement and legibility. Replace damaged, unreadable, or missing signs, tags, stickers, and pipe markings.
- Special attention should be given to spray patterns to eliminate ponding, runoff and wind blown spray conditions. If runoff is noted, affected areas should be indicated on a sketch and the volume should be estimated. If unauthorized ponding is detected, evidence of mosquitoes breeding within the ponding should be noted and immediately eliminated.
- Establish and maintain an accurate records keeping system of all inspections, modifications and repair work.
Broken sprinkler heads, faulty spray patterns, leaking pipes or valves, or any other noted condition which violates the use requirements shall be repaired immediately after the malfunction or condition becomes apparent.
|